{"id":22835,"date":"2026-02-11T10:36:42","date_gmt":"2026-02-11T09:36:42","guid":{"rendered":"https:\/\/nordiccrane.com\/en\/?p=22835"},"modified":"2026-02-11T10:36:43","modified_gmt":"2026-02-11T09:36:43","slug":"complex-project-in-lysekil","status":"publish","type":"post","link":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/","title":{"rendered":"Complex project in Lysekil"},"content":{"rendered":"\n<p class=\" eplus-wrapper\"><strong>During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.<\/strong><\/p>\n\n\n\n<p class=\" eplus-wrapper\">The project has been both demanding and rewarding, involving several different elements such as marine operations, SPMT transports and complex lifts using mobile cranes. The assignment was carried out with multiple involved parties and with high requirements for safety, documentation and quality.<\/p>\n\n\n\n<p class=\" eplus-wrapper\">Nordic Crane\u2019s ability to deliver according to plan is a clear result of competent and dedicated personnel as well as very strong collaboration with customers already during the planning phase. The weekly coordination meetings proved to be a key success factor, enabling early identification and management of challenges and risks, contributing to a safe and successful execution.<\/p>\n\n\n\n<p class=\" eplus-wrapper\">We would like to extend our sincere thanks to VAROPreem Refinery Lysekil, Fluor, Verwater and Kuehne+ Nagel for their trust and excellent cooperation throughout the project.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\" alignleft size-full is-resized eplus-wrapper\"><img decoding=\"async\" src=\"https:\/\/nordiccrane.com\/se\/wp-content\/uploads\/sites\/3\/2026\/02\/screen_12b7be6262a9a334_1765356002000-2.jpg\" alt=\"\" class=\"wp-image-23458\" style=\"width:823px;height:auto\"\/><\/figure><\/div>\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\" wp-block-spacer eplus-wrapper\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\" alignleft size-large is-resized eplus-wrapper\"><img decoding=\"async\" src=\"https:\/\/nordiccrane.com\/se\/wp-content\/uploads\/sites\/3\/2026\/02\/bild-20251203-083627-912fe6bf-1024x768.jpeg\" alt=\"\" class=\"wp-image-23445\" style=\"width:820px;height:auto\"\/><\/figure><\/div>","protected":false},"excerpt":{"rendered":"<p>During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":22836,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","editor_plus_copied_stylings":"{}","footnotes":""},"categories":[6],"tags":[],"class_list":["post-22835","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-prosjekter"],"acf":[],"featured_image_src":"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg","author_info":{"display_name":"Cato Brekke Andersen","author_link":"https:\/\/nordiccrane.com\/en\/author\/cato\/"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Complex project in Lysekil<\/title>\n<meta name=\"description\" content=\"During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Complex project in Lysekil\" \/>\n<meta property=\"og:description\" content=\"During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordic Crane English\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-11T09:36:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-11T09:36:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cato Brekke Andersen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cato Brekke Andersen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\"},\"author\":{\"name\":\"Cato Brekke Andersen\",\"@id\":\"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/a7250ac6fba223dd7c0faf6d4c805466\"},\"headline\":\"Complex project in Lysekil\",\"datePublished\":\"2026-02-11T09:36:42+00:00\",\"dateModified\":\"2026-02-11T09:36:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\"},\"wordCount\":181,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg\",\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\",\"url\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\",\"name\":\"Complex project in Lysekil\",\"isPartOf\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg\",\"datePublished\":\"2026-02-11T09:36:42+00:00\",\"dateModified\":\"2026-02-11T09:36:43+00:00\",\"author\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/a7250ac6fba223dd7c0faf6d4c805466\"},\"description\":\"During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.\",\"breadcrumb\":{\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage\",\"url\":\"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg\",\"contentUrl\":\"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nordiccrane.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Complex project in Lysekil\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nordiccrane.com\/en\/#website\",\"url\":\"https:\/\/nordiccrane.com\/en\/\",\"name\":\"Nordic Crane English\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nordiccrane.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/a7250ac6fba223dd7c0faf6d4c805466\",\"name\":\"Cato Brekke Andersen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/280e6a7c42b55b4430f570d41bf2e56571f009406fc6441dc1bbdfbb47f24c9d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/280e6a7c42b55b4430f570d41bf2e56571f009406fc6441dc1bbdfbb47f24c9d?s=96&d=mm&r=g\",\"caption\":\"Cato Brekke Andersen\"},\"url\":\"https:\/\/nordiccrane.com\/en\/author\/cato\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Complex project in Lysekil","description":"During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/","og_locale":"en_US","og_type":"article","og_title":"Complex project in Lysekil","og_description":"During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.","og_url":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/","og_site_name":"Nordic Crane English","article_published_time":"2026-02-11T09:36:42+00:00","article_modified_time":"2026-02-11T09:36:43+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg","type":"image\/jpeg"}],"author":"Cato Brekke Andersen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cato Brekke Andersen","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#article","isPartOf":{"@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/"},"author":{"name":"Cato Brekke Andersen","@id":"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/a7250ac6fba223dd7c0faf6d4c805466"},"headline":"Complex project in Lysekil","datePublished":"2026-02-11T09:36:42+00:00","dateModified":"2026-02-11T09:36:43+00:00","mainEntityOfPage":{"@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/"},"wordCount":181,"commentCount":0,"image":{"@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage"},"thumbnailUrl":"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg","articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/","url":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/","name":"Complex project in Lysekil","isPartOf":{"@id":"https:\/\/nordiccrane.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage"},"image":{"@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage"},"thumbnailUrl":"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg","datePublished":"2026-02-11T09:36:42+00:00","dateModified":"2026-02-11T09:36:43+00:00","author":{"@id":"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/a7250ac6fba223dd7c0faf6d4c805466"},"description":"During the month of December, we carried out several transports into VAROPreem Refinery Lysekil, with a result that was satisfactory for all parties involved. The largest tank transported weighed approximately 65 tonnes, with a diameter of 10 metres and a height of 10 metres \u2014 an assignment that placed high demands on planning and execution.","breadcrumb":{"@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#primaryimage","url":"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg","contentUrl":"https:\/\/nordiccrane.com\/en\/wp-content\/uploads\/sites\/5\/2026\/02\/bild-20251203-143530-73094b7d.jpeg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/nordiccrane.com\/en\/complex-project-in-lysekil\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nordiccrane.com\/en\/"},{"@type":"ListItem","position":2,"name":"Complex project in Lysekil"}]},{"@type":"WebSite","@id":"https:\/\/nordiccrane.com\/en\/#website","url":"https:\/\/nordiccrane.com\/en\/","name":"Nordic Crane English","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nordiccrane.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/a7250ac6fba223dd7c0faf6d4c805466","name":"Cato Brekke Andersen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nordiccrane.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/280e6a7c42b55b4430f570d41bf2e56571f009406fc6441dc1bbdfbb47f24c9d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/280e6a7c42b55b4430f570d41bf2e56571f009406fc6441dc1bbdfbb47f24c9d?s=96&d=mm&r=g","caption":"Cato Brekke Andersen"},"url":"https:\/\/nordiccrane.com\/en\/author\/cato\/"}]}},"_links":{"self":[{"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/posts\/22835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/comments?post=22835"}],"version-history":[{"count":1,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/posts\/22835\/revisions"}],"predecessor-version":[{"id":22837,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/posts\/22835\/revisions\/22837"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/media\/22836"}],"wp:attachment":[{"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/media?parent=22835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/categories?post=22835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nordiccrane.com\/en\/wp-json\/wp\/v2\/tags?post=22835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}